Home arrow Services
Services
Specifications - HM Bouger

self propelled pontoon / BARGE: WORK BOAT

     IN CURRENT 2D SURVEY

  • Twin screw 2 X 90 Hp 4-stroke outboards.
  • 360 degree fendering
  • Tow bollard.
  • Auxiliary Genset / 1.6 ton EWP can be fitted to the deck.
  • Air-conditioned smoko room / galley
  • Toilet, wash basin, and shower facilities 
  • Deck mounted anchor winch
  • 5 mm aluminium plate decking with all round double bit bollards

DIMENSIONS

  • 13. 5 meters length X 5.7 meters beam.
  • 1.0 meters molded depth
  • Net tonnage - 6.0 Ton

image001.jpgimage002.jpgimage003.jpgimage004.jpg

 
Specifications - MV Kenbi

CREW BOAT - MV KENBI: (Transfer vessel workboat )

      CURRENT 2D SURVEY

  • Twin screw 2 X 150 HP (four stroke outboard)
  • Center console operating location
  • Bow fitted with forward safe access / egress loading platform with safety rails
  • Bow fitted with forward rubberized pushing point
  • 360 degrees fendering

DIMENSIONS

  • 8 meters length
  • 2.4 meters beam.
  • Net tonnage - 2.5 T

image003.gif

 
LCT Landing Barge - MV Prime Mover
 

LCT Landing Barge - MV Prime Mover:

      CURRENT QLD, NT, & WA - 2B, 1C & 1D SURVEY

  • Twin screw 2 X 317 KW Detroit Series 60 engines
  • Drop down bow loading door, tow bollard, and gunwale fendering.
  • 2 X auxiliary genset running 240v power
  • Electric / hydraulic power pack running deck gear
  • Raised air-conditioned wheel house, with galley facilities
  • Spill kit fitted.
  • Air compressor for breathing or running air tools
  • Deck Crane to be fitted minimum 10.0 Ton @ 2.0 m.
  • Hydraulic deck winches for ships anchor pulling

DIMENSIONS

  • 23.9 meters measured length
  • 7.95 meters beam.
  • 2.7 meters molded depth
  • Displacement - 203 Ton

image001.jpg    image002.jpg    image004.jpg

 

image005.jpg    image007.jpg    image008.jpg

 
Specifications - MV Reliance
 

WORKBOAT/ BARGE / LIFT PONTOON - MV Reliance:

      CURRENT NSW 2D & 2E SURVEY

  • Twin screw 2 X 220 HP Perkins engines (very maneuverable unit).
  • Bow push-pads, tow bollard, and 360 degree fendering.
  • Perkins genset running 240v power
  • Electric / hydraulic power pack running deck crane and deck winch
  • Raised air-conditioned wheel house, with smoko room galley facilities
  • Spill kit fitted.
  • Oxy / acetylene cutting equipment mounted.
  • Air compressor for breathing or running air tools
  • Deck Crane fitted 10.0 Ton @ 2.0 m.
  • Deck Crane fitted 3.0 Ton @ 10.0 m.
  • 3 -Ton hydraulic deck winch with horizontal bow rollers
  • Total Deck loading 50 ton
  • Moon Pool fitted a couple of meters aft of the bow.
  • Bow loading ramp capable of loading 10m tipper or 13 ton excavator

DIMENSIONS

  • 16.00 meters measured length
  • 6.5 meters beam.
  • 1.8 meters molded depth
  • Net tonnage - 50 T (max)

image002.jpg                                   image003.jpg 

 
<< Start < Prev 1 2 3 4 Next > End >>

Results 9 - 12 of 15
© 2008 Work Boats Northern Australia | site by digiflip